Ministry Expansion Plan for July 31, 2019

Here’s what has happened in the last weeks: Work continues on the fire protection system throughout Work has begun on the new playground installation The drop ceiling is almost complete throughout the new addition The sprinklers have been installed in the area under the sanctuary The classrooms/meeting rooms under the fellowship hall have been completed Flooring has gone down in the new…

Ministry Expansion Plan for July 17, 2019

Here’s what has happened in the last weeks: The new kitchen appliances have been delivered Some of the floor and wall tiles have been installed in the restrooms New doors have been hung throughout the new Shaker Drive addition Stairs have been added in the lower level of the Shaker Drive addition Work continues on the fire protection system throughout Grading work…

Mars Hill 2019

For six hot days in July, sixteen people (children, youth, and adults) from CMPC met up with 49 other folks (from churches in Bowie, MD and Pittsburgh, PA) to serve brothers and sisters in need in Madison County, North Carolina.  Partnering with a local organization called The Community Housing Coalition the volunteers from three churches worked on eight different homes performing tasks…

Ministry Expansion Plan for July 3, 2019

Here’s what has happened in the last weeks: Grading work has begun around the Shaker Drive addition and will continue to include the new location of the playground Drywall is up almost entirely in both levels of the Shaker Drive addition Work continues on restoring the lower level restrooms (near the church office) More curbs have been poured as have the new…

Ministry Expansion Update for June 20, 2019

Here’s what has happened in the last weeks: Sprinkler installation continues in the Shaker Drive addition and has also spread to the preschool rooms Grading work has begun around the Shaker Drive addition and will continue to include the new location of the playground Drywall is going up in both levels of the Shaker Drive addition Work continues on restoring the lower…

Ministry Expansion Update for June 13, 2019

Here’s what has happened in the last weeks: Work continues on the new site lights in the parking lot—including demolition for the islands and construction of the bases Sprinkler installation continues in the Shaker Drive addition and has also spread to the preschool rooms Work continues on the EFIS (the bands above and below the Hardie board on the exterior of the…

Treats and Sweets 2019

Fourteenth Annual Treats & Sweets a Success Duets, choirs, soloists, bands, and quartets. Handcrafted artwork, cakes, fashion items, and a staycation package. Tastings, dinners, and culinary trips. This—and a whole lot more—was offered on Sunday evening June 9, at CMPC’s annual Musical Treats & Sweets fundraiser in the sanctuary. Over $5,000 was raised to help defray the cost to attend GenOn Youth…

Ministry Expansion Plan Update for May 30, 2019

Here’s what has happened in the last week: Work continues on the new site lights in the parking lot Sprinkler installation continues in the Shaker Drive addition Work continues on the EFIS (the bands above and below the Hardie board on the exterior of the building) The work will begin on installing the new roofs and replacing the sanctuary roof Demolition work…

Ministry Expansion Plan Update for May 23, 2019

Here’s what has happened in the last week: The baseboard was installed in the sanctuary Work continues on the new site lights in the parking lot The storm drain between Shaker Drive and the church was installed The stairs closest to the sanctuary and the wooden exit stairs out of Fellowship Hall have been removed Sprinkler installation continues in the Shaker Drive…

Ministry Expansion Plan for May 16, 2019

Here’s what has happened in the last week: Work has begun on the new site lights in the parking lot The storm drain between Shaker Drive and the church building is being installed Work has begun on demolishing the stairs closest to Fellowship Hall, the wooden exit stairs, and the windows in Fellowship Hall Sprinkler installation continues in the Shaker Drive addition…