Here’s what has happened in the last week: The concrete for the stairs in the new entrance was poured The walls were cut for the new passageways between the downstairs hallway and the new Shaker drive addition, between the lower level of the new Shaker Drive addition and the old choir robing room, and between the upper level of the new Shaker…