Presbyterian Church in Columbia, Maryland
Worship Every Sunday at 10:30 a.m.

Ministry Expansion Plan Update for February 22, 2019

Here’s what has happened in the last week:

  • The power switchover took place on Tuesday.  BGE and our electrical subcontractor (Shaw Electric) worked hard to get the power restored before the end of the day
  • Electrical work throughout the building continues
  • Work has begun on the water main project along Shaker Drive (which will provide our new water service)
  • The foundation for the new stair tower was poured and passed inspection
  • The cinder block portion of the walls of the stair tower were constructed
  • The new sanctuary HVAC was delivered
  • The new windows for the fellowship hall end of the building have been installed
  • A new temporary heating system was delivered and installed

Here’s what is scheduled to happen in the next week (or so):

  • Work continues on the framing out of the new perimeter bulkhead in the sanctuary (which will hide the new sprinkler pipe)
  • Steel columns and beams for the new stair tower and entrance will be installed
  • The concrete slab of the new stair tower and entrance will be poured
  • Work will continue on the sprinkler system in the sanctuary

Keep checking back here each week for updates.  If you have questions please feel free to reach out to Pastor Scott at pastor.hoffman@cmpcusa.org