Here’s what has happened in the last week:
- New lights are being installed in the sanctuary
- More steel beams were set in the Shaker Drive addition
- Framing of the new exterior and interior walls in the Shaker Drive addition is underway
- Hardie board is being installed on the exterior of the new entrance and on the exterior of Fellowship Hall
- The foundation for the Shaker Drive addition has been backfilled
- The floor along the new perimeter of Fellowship Hall was leveled (on the parking lot side)
Here’s what is scheduled to happen in the next week (or so):
- Some touch up work on the celling in the sanctuary will be completed
- The drywall will be completed in the new entrance
- Painting in the new entrance will begin
- The new stairs will be added to the new entrance
- The floor protection in the sanctuary will be removed and the carpet thoroughly cleaned
- Roof trusses will be added to the Shaker Drive addition
- Work will continue on the new HVAC systems
- Sprinkler pipes will be added to Fellowship Hall