Here’s what has happened in the last week:
- Painting is complete in the sanctuary
- Drywall is up in the new entrance.
- Steel beams were installed in the Shaker Drive addition
- The floor trusses were added to the Shaker Drive addition (and plywood sheathing is going down today)
- The old windows in Fellowship Hall on the parking lot side of the church have been removed
- Sprinkler pipes have been added to the new entrance
Here’s what is scheduled to happen in the next week (or so):
- New lights will be installed in the sanctuary
- Framing of the new walls in the Shaker Drive addition will be done
- Hardie board will be installed on the exterior of the new entrance and on the exterior of Fellowship Hall
- The floor protection in the sanctuary will be removed and the carpet thoroughly cleaned
- Work will begin on installing the stairs tin the new entrance
- The foundation for the Shaker Drive addition will be backfilled








