Here’s what has happened in the last week: Work has been completed on the framing out of the new perimeter bulkhead in the sanctuary (which will hide the new sprinkler pipe) Steel columns and beams for the new stair tower and entrance have been installed The heads are being installed on the new sprinkler system in the sanctuary Ductwork has been installed…