Here’s what has happened in the last week: The openings left by the removal of the downstairs windows have been filled in, insulated, and closed up with drywall (save the spaces where the new windows will be installed) The skylight in the sanctuary was framed out The overhang around the downstairs perimeter of fellowship hall has been framed out and is awaiting…