Work continues on the Ministry Expansion Plan. This week the ceilings in the downstairs entryway, downstairs hallway, and upstairs lobby (outside the elevator and top of the stairs) were demolished to allow the electrician to trace old and new electric service (see pics). In addition, the switchgear was delivered. (In an electric power system, switchgear is the combination of electrical disconnect switches, fuses or circuit breakers used to control,…